Thermal inspection for solar farms · SoCal

Find every failed string before it costs you a season.

Autonomous VTOL thermal inspection designed to cover an entire solar farm in one flight, with every fault pinned to its exact module.

Become a design partner

No-cost inspections this winter for a small number of Southern California sites.

Row C · Module 7 · hot spot String 14 · offline
Illustration: a top-down diagram of six rows of solar panels, A to F. One string in row F is highlighted as offline, and module 7 in row C is pinned as a hot spot.

01 / The problem

Equipment faults cost the average U.S. solar site about 5% of its output.

That share has doubled in five years. Sites that are inspected more often lose less.

Share of output lost to equipment faults
Share of output lost to equipment faults, U.S. solar, 2019 to 2025 Line chart. 2019: 1.61%. 2021: 2.36%. 2023: 4.47%. 2025: 5.08%. 1.61%20192.36%20214.47%20235.08%2025

2019, 2023: Raptor Maps via PV Tech. 2021, 2025: Raptor Maps, 2026 Global Solar Report, via PV Tech (now.solar).

Figures come from different editions of the Raptor Maps report.

Loss by inspection frequency
Average power loss by how often a site is inspected Bar chart. Sites inspected once a year: about 7% average power loss. Sites inspected five times a year: about 3%. 7%Once a year3%Five times a year

Source: Raptor Maps, 2026 Global Solar Report, via PV Tech (now.solar)

5%

Average production lost to equipment faults in 2025: 5.08%, across 373 GW of U.S. utility-scale and C&I solar. Up from 2.36% in 2021.

Source: Raptor Maps, 2026 Global Solar Report, via PV Tech (now.solar)

7% / 3%

Average power loss at sites inspected once a year, compared with sites inspected five times a year.

Source: Raptor Maps, 2026 Global Solar Report, via PV Tech (now.solar)

$5,070/MW

Annual revenue a U.S. site at the 2025 average loss rate could be losing, per MW.

Source: pv magazine, 25 February 2026

02 / How it works

Four steps, from site boundary to work orders.

Every flight will be flown by an FAA Part 107-certified remote pilot.

Concept animation. Real flight footage coming after first flights.
  1. 01

    Plan

    We take your site boundary and array layout, agree access with your site team, and schedule the flight for a window with enough irradiance for reliable thermal readings.

    You provide: site boundary, layout, an on-site contact

  2. 02

    Fly

    The aircraft takes off vertically from a small clear area and flies a pre-planned route over the arrays, capturing thermal and RGB imagery while irradiance is logged. An FAA Part 107-certified remote pilot will be on site for every flight.

    On site: one remote pilot, one small takeoff area

  3. 03

    Report

    We process the imagery into a report that places each fault on its module, classifies its severity, and attaches the frames behind it.

    You receive: PDF, CSV and KML · see the sample

  4. 04

    Fix

    Your technicians go straight to the flagged modules, strings and combiners instead of walking rows. A follow-up flight can confirm the repairs.

    Result: a prioritized fault list your crew can work from

03 / What you get

A fault list your technicians can work from, module by module.

Each inspection produces one report, in the formats your team already uses.

Report deliverables
Module-level geolocated faultsEach fault located to block, row, string and module, with coordinates.
SeverityEach fault classified by severity, so crews fix the largest production and safety risks first.
Thermal + RGB framesThe radiometric thermal frame and the matching RGB frame behind every finding.
Irradiance logIrradiance recorded throughout the flight, so each thermal reading comes with the conditions it was taken in.
PDF, CSV and KML exportsA readable report, a fault list for your work-order system, and a map layer for Google Earth or GIS.
IEC TS 62446-3Inspections built to follow IEC TS 62446-3, with on-site irradiance logged for every flight.

Sample report

Synthetic data · not from a real flight

Site
Sample Site A (fictional)
Capacity
20 MWdc
Capture
Thermal + RGB
Findings
6
Synthetic site map with four panel blocks and six numbered findings. The same findings are listed below the map.

    Select a finding on the map or in the list. Every value in this sample is made up to show the report format. A delivered report adds coordinates for each module, the source frames, and the full irradiance log.

    04 / Why Orithian

    Built to inspect the whole site, more often, for less.

    Three of these are design goals we will verify in flight testing this winter. They are marked as such.

    1. 01

      The whole site in one flight

      OR-2 takes off vertically like a multirotor and cruises on a fixed wing. Wing-borne flight is what makes covering a utility-scale site in a single flight practical.

      Design goal
    2. 02

      Frequent inspection at lower cost

      Fewer flights and less time on site per inspection bring the cost down far enough to inspect several times a year instead of once.

      Design goal
    3. 03

      RTK, module-level accuracy

      RTK-corrected positioning places each fault on a specific module, so a technician walks to one panel, not one row.

      Design goal
    4. 04

      A local Southern California team

      We are based in Los Angeles. Southern California sites are a drive away, so follow-up flights are easy to schedule.

      Edgar Reyes, Co-founder · Brandon Ly, Co-founder

      Today

    05 / How we build

    Built in-house, improved every week.

    We design OR-2 ourselves and 3D-print its airframe on our own printers. That keeps the aircraft, and the schedule for your inspections, in our hands.

    Inside one of our 3D printers: a large white airframe part, partway through printing, with the print head resting on its top edge. A diamond pattern of internal ribs shows through its smooth outer wall.
    An airframe part partway through printing on one of our printers.
    1. 01

      Improvements reach you quickly

      When we find something to improve, we change the design and print new parts ourselves. There is no outside supplier to wait on.

    2. 02

      Fast repairs

      If a part is damaged, we print a replacement. A broken part doesn't hold up the schedule.

    3. 03

      A lower cost for each inspection

      Making the aircraft ourselves keeps its cost down, and with it what each inspection costs you.

    06 / How to start

    Design partner offer

    We're inspecting a small number of Southern California sites at no cost this winter. You pay only if the report is useful to your team.

    Become a design partner
    • You getA full inspection and report, as described above
    • We needSite boundary and layout, an on-site contact, and a flight date
    • Who will flyAn FAA Part 107-certified remote pilot

    07 / The aircraft

    OR-2, a VTOL fixed-wing aircraft we design and build.

    It takes off and lands vertically from a small area and flies on its wing over the arrays. We will publish measured specifications after flight testing.

    Technical line drawing of OR-2, Design B, in plan, front and side views. A straight tapered wing on a slender fuselage, a V-tail, two booms under the wing carrying four lift motors, a pusher motor at the tail, a sensor pod under the fuselage, and four landing legs.
    OR-2 general arrangement. In development.
    Model
    OR-2
    Configuration
    VTOL fixed-wing
    Status
    In development, first flights this winter
    Specifications
    Published after flight testing

    08 / Team

    Founders

    Based in Los Angeles.

    • Edgar Reyes, smiling, in a dark blazer and white shirt, under a brick archway.

      Edgar Reyes

      Co-founder

      Edgar is an aerospace structures engineer with a B.S. in Mechanical Engineering from UCLA. As CTO of UAS@UCLA, he built autonomous drones for competition.

    • Brandon Ly

      Co-founder

      Brandon is a mechanical engineering student at UCLA and president of UAS@UCLA, the university's autonomous drone team.

    09 / Contact

    Tell us about your site.

    For solar operators and asset owners. Send the basics and we will reply by email about scheduling an inspection.

    Research partners and investors

    For hardware, research or investment conversations, send a short note.